- Added acceleration to the homing routine.
- Homing now accounts for different step rates when moving multiple
axes without exceeding acceleration limits.
- Homing now updates all internal positioning variables to machine zero
after completion.
- "Poor-man's" debounce delay added.
- Updated the delay_us() function to perform faster and more accurate
microsecond delays. Previously, the single increments would add
noticeable time drift for larger delays.
- Fix a bug in the stepper.c prescalar calculations that was changed in
the last commit.
- Other minor fixes.
- G54 work coordinate system support. Up to 6 work coordinate systems
(G54-G59) available as a compile-time option.
- G10 command added to set work coordinate offsets from machine
position.
- G92/G92.1 position offsets and cancellation support. Properly follows
NIST standard rules with other systems.
- G53 absolute override now works correctly with new coordinate systems.
- Revamped g-code parser with robust error checking. Providing user
feedback with bad commands. Follows NIST standards.
- Planner module slightly changed to only expected position movements
in terms of machine coordinates only. This was to simplify coordinate
system handling, which is done solely by the g-code parser.
- Upon grbl system abort, machine position and work positions are
retained, while G92 offsets are reset per NIST standards.
- Compiler compatibility update for _delay_us().
- Updated README.
- Program stop support (M0,M1*,M2,M30*). *Optional stop to be done.
*Pallet shuttle not supported.
- Work position is set equal to machine position upon reset, as
according to NIST RS274-NGC guidelines. G92 is disabled.
- Renamed mc_set_current_position() to mc_set_coordinate_offset().
- Fixed bug in plan_synchronize(). Would exit right before last step is
finished and caused issues with program stops. Now fixed.
- Spindle now stops upon a run-time abort command.
- Updated readme and misc upkeeping.